Summary of the Ethylene Industry in 1998
Thanks to strenuous efforts made by ethylene produc-ers in
active market expansion, new developments were made in the
ethylene industry in 1998.
1. Output exceeding 3770 kt
A full-load production of ethylene was made in 1998. The
output hit the historical record through adopting various
measures such as shortening the overhaul time, ensuring
the matching and stability of downstream production units
and utilities and actively expanding the product market.
The target output in the ethylene industry for 1998 was 3
740 kt, and the planned output in China Petrochemical
Corporation was 2 230 kt. Both the target output and the
planned output were over-fulfilled. The actual output in
the ethylene industry was 3 772.392 kt, a rise of 193. 191
kt and 5.40% over 1997. The actual output in China
Petrochemical Corporation was 2 267.786 kt, a rise of 17
.989 kt and 0.8%. The actual output in China National
Petroleum Corporation was 1 272.776 kt, a rise of 144. 596
kt and 12.82%.
(1) In spite of an 18-day overhaul, the actual output in
Yanshan Petrochemical Corporation still reached 491.402 kt
in 1998, with an average daily output of 1 416 t, 4 t/d
higher than 1997. The North furnace was put in use in
September 1998, and a high-load and stable production in
the ethylene units can be all the more guaranteed.
(2) An overhaul was conducted and technical renovation and
expansion was completed in Qilu Petrochemical Corporation.
It took 39 days from the shutdown to the production of
qualified product. The production was re-started on Sept.
27. The maximal capacity expansion technology (MCET) from
Lummus was used and the capacity of ethylene units reached
450 kt/a. The actual output was 335.555 kt in 1998, a rise
of 7 369 t and 2.25% over 1997.
(3) No overhaul was conducted in Yangzi Petrochemical
Corporation. The actual output was 409.123 kt in 1998, a
rise of 10.915 kt and 2.74% over 1997. At a time of
ethylene price reduction in the international market,
Yangzi Petrochemical Corporation imported ethylene from
abroad by low- temperature storage tanks, reduced the
production loan of ethylene units and achieved good
economic benefits. The company also expanded the product
market by developing small users.
(4) No overhaul was conducted to 1# ethylene unit in
Shanghai Petrochemical Corporation. An overhaul and
technical renovation and expansion were conducted to 2#
ethylene unit. The shutdown took place on Dec. 20, 1997
and the production was re-started on Feb. 22, 1998. The
capacity was expanded to 400 kt/a. The actual output was
503.493 kt in 1998, a rise of 49.044 kt and 10. 93% over
1997, holding the first place in the ethylene industry.
The average daily output in 2# ethylene unit was 1 115 t.
(5) The unmatched ethylene balance in downstream units of
Tianjin Petrochemical Corporation restricted the further
expansion of the ethylene capacity. In spite of a 23- day
overhaul, the actual output still reached 134.753 kt, 102
.08% of the yearly plan 132 kt, a rise of 5 735t and 4.45%
over the actual output 129.018 kt in 1997 (with no overhaul)
.
(6) The ethylene units in Maoming Petrochemical Corporation
made a continuous running of 28 months by the end of 1998,
and the output reached the planned target for two
consecutive years. The actual output was 304.362 kt in 1998,
101.454% of the yearly plan 300 kt, a rise of 3 224 t and 1.
07% over 1997. The average daily output was 834 t.
(7) In spite of a two-month shutdown for rectification, the
actual output in Zhongyuan Petrochemical Corporation still
reached 89.098 kt in 1998, a drop of 29. 16% from the
actual output 110.794 kt in 1997.
( 8) The yearly plan was over- fulfilled in Daqing
Petrochemical General Works. The actual output was 366.666
kt, hitting the historical record, a rise of 36.5 kt and 11.
06% over 1997. No overhaul was conducted. The production
was smooth and stable and there were no shutdowns. The
average daily output was 1 005 t.
(9) The ethylene units in Liaoya-
ng Oil and Chemical Fiber Corporation adopted a series of
measures to conduct technical renovation, optimize
production and implement assessment systems in 1998. In
spite of a 17- day overhaul, the actual output still
reached 93.015 kt, 101.25% of the yearly plan, but a drop
of 5 873 t and 5.94% from 1997. The average daily output
was 270 t, equal to 1997.
(10) The 28-day overhaul conducted to the ethylene units in
Lanzhou Chemical Industrial Corporation in 1998 removed
problems in technical renovation and expansion. The
operation was improved after the re-start of production.
The actual output was 130.003 kt, a rise of 18.7 kt and 16
.80% over 1997. The average daily output was 386 t, much
higher than 314 t/d in 1997. However, only 81.25% of the
yearly plan 160 kt was fulfilled.
(11) A 25-day overhaul was conducted to the ethylene units
in Fushun Petrochemical Corporation in 1998. The actual
output was 140.518 kt in 1998, a rise of 20 kt and 16. 69%
over 1997. The yearly plan 140 kt was over- fulfilled and
the design output target 140 kt/a was attained. The units
made a smooth and stable running for the whole year. The
average daily output was 413 t.
(12) Due to the insufficient ability of ethylene balance in
downstream units, the ethylene production in Jilin
Chemi